Viessmann Vitodens 200-W System Spécifications

Naviguer en ligne ou télécharger Spécifications pour Chauffages d'appoint Viessmann Vitodens 200-W System. Viessmann Vitodens 200-W System Specifications [en] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 76
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
VITODENS 200-W
Installation Instructions
For Corgi Registered Heating Engineers
Vitodens 200-W
Type WB2B, 4.8 to 35.0 kW
Wall mounted gas fired condensing boiler
Natural Gas and LPG version
5350 485 GB 08/2007 Please keep these instructions in a safe place
Vitoden 200-W installation 4/9/07 7:27 pm Page 1
Vue de la page 0
1 2 3 4 5 6 ... 75 76

Résumé du contenu

Page 1 - Installation Instructions

VITODENS 200-WInstallation InstructionsFor Corgi Registered Heating EngineersVitodens 200-WType WB2B, 4.8 to 35.0 kWWall mounted gas fired condensing

Page 2 - 5350 485 GB 08/2007

105350 485 GB 08/2007Installation clearancesThe following minimum clearances (mm) must be maintained for installingand maintaining the appliance.Behin

Page 3

11Sectional diagramCombination boiler illustrated5350 485 GB 08/2007Vitoden 200-W installation 4/9/07 7:27 pm Page 11

Page 4 - Product information

125350 485 GB 08/2007In addition to the above regulations, thisappliance must be installed in accordancewith the current IEE Wiring Regulationsfor ele

Page 5 - Safety instructions

13Flue terminal position• If the appliance is to be installed in aroom containing a bath or shower, anyelectrical switch or control utilising mains el

Page 6 - Safety instructions (cont.)

145350 485 GB 08/2007Flue terminal position (cont.)Vertical flue systemsPositionCDEFGHIJKLMN200mm200mm150mm300mm300mm600mm1200mm1200mm1500mm300mm300mm

Page 7 - Technical Specification

15Flue terminal position (cont.)PositionOPQR300mm1000mm600mm300mmFrom adjacent wall From adjacent opening windowFrom another terminalMinimum heightMin

Page 8

165350 485 GB 08/2007Flue systemFlue gas temperature protectionThe flue pipes are approved for flue gas temperatures up to 120 ºC. The interiordesign

Page 9

17Flue system (cont.)Concentric Vertical Flue SystemThe vertical flue kit option with extensionsmay be used for up to 10m total fluelength.An extra 87

Page 10 - Installation clearances

185350 485 GB 08/2007Flue system (cont.)Elbows and extensionsExtensionElbow 87ºElbow 45ºVitoden 200-W installation 4/9/07 7:27 pm Page 18

Page 11 - Sectional diagram

Plume kit standard delivery 2m maxlengthAPlume kit standard deliveryadditional options:• 2 x 87º bends• 1 pipe 1m longPlume kit standard deliveryaddit

Page 12 - Installation requirements

IndexProduct information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Safety instructi

Page 13 - Flue terminal position

205350 485 GB 08/2007Fitting the plume kit1. Unhook the external wall terminal of theflue at the external pipe and extract theflue with the end piece

Page 14 - Vertical flue systems

21Fitting the plume kit (cont.)4. Push the replacement pipe with the connector and flue bend into the innerflue duct and secure with the screws suppli

Page 15 - Flue Terminal Location

225350 485 GB 08/2007Fitting the plume kit (cont.)6. Fit the flue pipes and bends in accordance with the selected installationmethod and secure with t

Page 16 - Flue system

23Hydraulic connectionsHeating System (typical system designs)• The Vitodens 200-W is designed for connection to sealed central heatingwater systems o

Page 17 - Flue system (cont.)

245350 485 GB 08/2007Hydraulic connectionsHydraulic circuitsCombination boilerBoilerAHeat exchangerBCirculation pumpCThree port diverter valveDPlate-t

Page 18

25Hydraulic connectionsSystem boiler using separate connections for DHW Cylinder & heating circuits (4 pipes)DHW cylinderABoilerBHeat exchangerCCi

Page 19 - Routing options

265350 485 GB 08/2007Hydraulic connectionsWeather compensated control instructions are supplied with the replacement controller and outside sensor kit

Page 20 - Fitting the plume kit

27Gas and electric supplyGas supply• The Gas Supply should be checked at the installation planning stage in order to establish the availability of an

Page 21 - Fitting the plume kit (cont.)

285350 485 GB 08/2007Electrical connectionsElectrical ConnectionsBoth combination and system boilersrequire a permanent live 240V supply. Combination

Page 22

29Constant temperature control unitControl and display elementsHeating modeThe selected set boiler water temperaturewill be maintained when a demand i

Page 23 - Hydraulic connections

IndexElectrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46Combination boile

Page 24

305350 485 GB 08/2007Constant temperature control unit (cont.)DHW heating with gas fired combi boilersIf the flow switch detects that hot water isbein

Page 25

31Constant temperature control unitHeating programmes ON/OFFAInfo functionBFactory default settingCResetDValue adjustmentEDHW temperatureFService fun

Page 26

325350 485 GB 08/2007Hydraulic components in the boilerPumpThe following figure shows the pump head that is available in excess of the hydraulic resis

Page 27 - Gas and electric supply

335350 485 GB 08/2007Installation of boilerUnpacking the applianceThe appliance is supplied in 2 separate packages plus any optional flue packages. Ch

Page 28 - Electrical connections

345350 485 GB 08/2007Preparing the connectionsNoteFor dimensions for on-site preparations of the gas and water connections see “OverallAppliance Dimen

Page 29 - Heating mode

355350 485 GB 08/2007Wall mounting bracket installationImportantBefore installing the appliance, check that the chosen position is suitable, adequate

Page 30

365350 485 GB 08/2007Wall mounting bracket installation (cont.)Vitoden 200-W installation 4/9/07 7:27 pm Page 36

Page 31

375350 485 GB 08/2007Wall mounting bracket installation (cont.)Safety lifting adviceWhen handling or lifting the boiler body always use safe technique

Page 32 - Expansion vessel

38Installing the boiler and making all connectionsRemove front panel and mount boilerNoteThe front panel must be removed before mounting the boiler.No

Page 33 - Installation of boiler

395350 485 GB 08/2007Safety discharge connectionConnect a suitable discharge pipe to the pressure relief valve outlet. The pipemust discharge to a saf

Page 34 - Preparing the connections

4Product informationVitodens 200-WType WB2B, 4.8 to 35.0 kWSet up for operation with natural gas.Boiler Type GC numberVitodens 200-W WB2B System, 19

Page 35 - Important

405350 485 GB 08/2007Condensate connectionRoutingThe condensate pipe can terminate into any one of the following areas.It is always best practice to t

Page 36

415350 485 GB 08/2007Condensate connection (cont.)Ø22mm plastic condensate pipeAExternal length of pipe 3m max.BOpen end direct into gully, belowgroun

Page 37 - Safety lifting advice

425350 485 GB 08/2007Condensate connection (cont.)Ø22mm plastic condensate pipeAExternal length of pipe 3m max.BOpen end direct into gully, belowgroun

Page 38

435350 485 GB 08/2007Filling the siphon with waterGas connection1. Remove retaining clip and siphon AB2. Fill siphon with waterB3. Fit siph

Page 39 - Safety discharge connection

44Flue outletExternal wall terminal C131. Insert pipe bend into the boiler flue outlet.2. Insert external flue terminal through the wall.3. Secure the

Page 40 - Condensate connection

455350 485 GB 08/2007Flue outlet (cont.)Vertical roof terminal C331. Install the universal roof tile.2. Install flue and supply pipes accordingly.3. P

Page 41 - Condensate connection (cont.)

46Electrical connectionsOpening the control unit casing5350 485 GB 08/2007Vitoden 200-W pages 44 - 4/9/07 7:56 pm Page 3

Page 42

475350 485 GB 08/2007Electrical connectionsCombination boilerMains power connection 230 V ~ 50 Hz(green plug).Do not interchange the supply conductors

Page 43 - Gas connection

48Electrical connections (cont.)Separate hydraulic connections for DHWcylinder and heating circuits (4 pipes).• The Viessmann low voltage DHW cylinde

Page 44 - Flue outlet

495350 485 GB 08/2007CodingCalling up code 2Note• On weather-compensated control units,codes are displayed as plain text.• Codes that are irrelevant d

Page 45 - Flue outlet (cont.)

5Safety instructionsPlease follow these safety instructions closely to prevent the risk of accidents and material damage.Safety instructions explained

Page 46

50Y & S Plan system (2 pipes) (Hydraulic cylinder Flow and Return connectionscapped off at the boiler)• Connect the required permanent livesupply

Page 47

515350 485 GB 08/2007Electrical connections (cont.)Routing the connecting cablesNoteIf connecting cables touch hot components they will be damaged.Whe

Page 48

52Closing the control unit casing5350 485 GB 08/20074.Vitoden 200-W pages 44 - 4/9/07 7:56 pm Page 9

Page 49 - Calling up code 2

535350 485 GB 08/2007Further details regarding the individual stepsFilling the heating systemNoteUnsuitable fill water increases thelevel of deposits

Page 50 - Heating only system (2 pipes)

54Further details regarding individual steps (cont.)Venting the boiler1. Close the shut-off valves on the heatingwater side.2. Connect the drain hose

Page 51 - Routing the connecting cables

555350 485 GB 08/2007VentingVenting programDuring the venting program, the circulationpump will be alternately switched ON andOFF for 30 s respectivel

Page 52

565350 485 GB 08/2007Checking diaphragm expansion vessel and system pressureNoteCarry out this test on a cold system.1. Drain the system, or close the

Page 53 - Filling program

575350 485 GB 08/2007Gas supplyGas type conversion (only for operation with LPG)1. Set the adjusting screw at the gastrain to “2”.2. Switch On th

Page 54 - Venting the heating system

585350 485 GB 08/2007Gas supplyOperation with Nat Gas or LPG1. Close the gas shut-off valve.2. Undo the screw inside connector “IN”on the gas train, b

Page 55 - Venting program

595350 485 GB 08/2007Gas supply6. Check the working pressure.Set values:• natural gas 20 mbar• LPG 37 mbarNoteUse suitable test equipment with a reso

Page 56 - Wobbe index ranges

6Safety instructions (cont.)Working on the system• Close the main gas shut-off valve and safeguard against unauthorised reconnection.• Isolate the sys

Page 57 - Gas supply

605350 485 GB 08/2007Setting the maximum CH output1. Start the boiler2. Press and simultaneouslyuntil a value appears and flashes (e.g

Page 58

615350 485 GB 08/2007Flue system checkFor balanced flue systems tested togetherwith the wall mounted gas fired boiler, werecommend that a simple sound

Page 59

625350 485 GB 08/2007CombustionIf the actual CO2 or O2 values lie outside their respective ranges, proceed withthe following steps:• Check the balance

Page 60 - Setting the maximum CH output

635350 485 GB 08/2007Heating system start-upCheck the heating system pressure on the pressure gauge (A). The system pressure is too low if the needle

Page 61 - Flue system check

645350 485 GB 08/2007Starting a heating circuit and DHW heating/loadingCentral heating and DHW• Central heating active• DHW will be loaded (subject to

Page 62 - Combustion

655350 485 GB 08/2007Switching the comfort function ON and OFFMake adjustments using the appropriateroom thermostat operating instructions.Please also

Page 63 - Heating system start-up

665350 485 GB 08/2007Adjusting the boiler water temperaturePress the following keys:If a remote control unit is connected:Set the room temperature on

Page 64 - Starting DHW only

675350 485 GB 08/2007Scanning informationSubject to connected components, you can scan current temperatures and operating conditions.Press the followi

Page 65 - Room temperature

685350 485 GB 08/2007Function sequence and possible faultsControl unit issues heat demandIncrease set valueand ensure heat isdrawn offFan starts after

Page 66

695350 485 GB 08/2007Function sequence and possible faults (cont.)Burner in operationFor further details regarding faults see the service instructions

Page 67 - Scanning information

7Technical SpecificationGeneral Specifications and Performance Data.5350 485 GB 08/2007Vitodens 200-W WB2BAppliance Combi 26 kW Combi 30 kW Combi 35 k

Page 68

70Fitting the outer case5350 485 GB 08/2007NoteAlways insert the locking screws before commencing operation.Vitoden 200-W pages 44 - 4/9/07 7:56 pm

Page 69

715350 485 GB 08/2007Vitoden 200-W pages 44 - 4/9/07 7:56 pm Page 28

Page 70 - Fitting the outer case

Vitoden 200-W pages 44 - 4/9/07 7:56 pm Page 29

Page 71

735350 485 GB 08/2007Declaration of conformityDeclaration of conformity for the Vitodens 200-WWe, Viessmann Werke GmbH&Co KG, D-35107 Allendorf, d

Page 72

74Manufacturer’s certificate according to the 1st BlmSchV(Germany)Allendorf, 1 December 2006 Viessmann Werke GmbH&Co KGpp. Manfred SommerWe, Viess

Page 73 - Declaration of conformity

755350 485 GB 08/2007Vitoden 200-W pages 44 - 4/9/07 7:56 pm Page 32

Page 74 - (Germany)

Viessmann Werke GmbH&Co KGD-35107 AllendorfTel: +49 6452 70-0Fax: +49 6452 70-2780www.viessmann.comViessmann LimitedHortonwood 30, Telford, TF1 7Y

Page 75

85350 485 GB 08/2007Technical SpecificationGeneral Specifications and Performance Data.Vitodens 200-W WB2BApplianceSystem 19 kW System 26 kW System 30

Page 76 - Applicability

9Appliance dimensions/connections5350 485 GB 08/2007Heating flow Rp 3/4" to 22mm CuADHW Rp 1/2" (combi boiler) to 15mm CuCylinder flow G 3/4

Commentaires sur ces manuels

Pas de commentaire