Vue de la page 0
VITODENS 200-W
Installation Instructions
for use by heating contractor
Vitodens 200-W, WB2B Series
Models 19, 26, 35
Wall-mounted, gas-fired condensing boiler
For operation with natural gas and liquid propane gas
Heating input 31 to 125 MBH
9 to 37 kW
Read and save these instructions
for future reference.
IMPORTANT
This trademark is registered with the U.S. Patent and Trademark Office.
Please file in Service Binder
5369 297 v1.6 12/2011
Vue de la page 0
1 2 3 4 5 6 ... 63 64

Résumé du contenu

Page 1 - Installation Instructions

VITODENS 200-WInstallation Instructionsfor use by heating contractorVitodens 200-W, WB2B SeriesModels 19, 26, 35Wall-mounted, gas-fired condensing boi

Page 2

Set-up10Before Set-upBefore placing boiler in its installationlocation, ensure all necessaryaccessories are installed.Minimum ClearancesRecommended mi

Page 3 - General Information

Boiler Connections11Preparing the ConnectionsConnections overviewUse an approved pipe sealant or teflon tape when connecting the following installatio

Page 4 - Additional Information

Boiler Connections12Preparing the Connections (continued)Connections overview (continued)Use an approved pipe sealant or teflon tape when connecting t

Page 5

Boiler Connections13Wall MountingInstalling the wall mounting bracketLegendReference point for top of boilerMounting templateFinished floor levelDimen

Page 6

Boiler ConnectionsFig. 6 General installation of mounting bracketaa = 16”/407 mmFig. 7 Installation of mounting bracket on wood studs16”/407 mm3/16”2x

Page 7

Boiler Connections15Wall Mounting (continued)Mounting the boiler1. To open hinged cover, lift cover Aand pivot control unit flap B down.All boiler con

Page 8 - Product Information

Boiler Connections16ConnectionsConnecting the power supplySee Power/PumpModule InstallationInstructionsThe Vitodens 200-W boiler is shippedwith a Powe

Page 9 - Mechanical Room

Boiler Connections17Connections (continued)Gas connection and pipingLegendGas connection ∅ ¾“ (NPT)Accessible manual gasshutoff valveGround joint unio

Page 10 - Minimum Clearances

Boiler Connections18Connections (continued)Gas piping pressure testWhen performing the gas piping pressure test, ensure the following requirements are

Page 11 - Preparing the Connections

Boiler Connections19Connections (continued)Heating water connectionsLegendAV Air Vent (inside boiler)BD Boiler DrainBF Boiler FillPRV Pressure Relief

Page 12 - IMPORTANT

Safety, Installation and Warranty Requirements2Safety, Installation and Warranty RequirementsPlease ensure that these instructions are read and unders

Page 13 - Wall Mounting

Boiler Connections20Connections (continued)DHW storage tank informationThe DHW water tank sensor is required when using a stand-alone DHW storagetank

Page 14 - Wall Mounting (continued)

Boiler Connections21Connections (continued)Making the DHW connections (continued)1. With a Vitocell 100 DHW storagetank:Insert DHW tank temperature se

Page 15

Boiler Connections22Connections (continued)Accessing the control unit cables1. To open hinged cover, lift cover andpivot control unit flap down.2. Rel

Page 16 - Connections

Boiler Connections23Connections (continued)Connecting DHW sensor1.Attach the DHW sensor to the quickconnect plugs provided from theboiler control boar

Page 17 - Connections (continued)

Boiler Connections24Connections (continued)Condensate connectionThe Vitodens 200-W WB2B boiler comes with a built-in condensate trap. An external trap

Page 18

Boiler Connections25Safety Connections and Pressure TestingInstalling boiler safety devicesLegendExtension, 2¼”x ¾”Tee, ¾”Brass nipple, length 3” x ¾”

Page 19

Boiler Connections26Safety Connections and Pressure Testing (continued)Performing a boiler pressure testThe boiler must be leak tested beforebeing pla

Page 20

27Installation ExamplesGeneralThe schematics on the following pagesare to be seen as guidelines only. Theyfurther do not display all systemvarieties,

Page 21

Boiler Connections28Installation Examples (continued)Waterside flow (primary circuit)The Vitodens 200-W, WB2B is designed for closed loop, forced circ

Page 22

Boiler Connections29Installation Examples (continued)System layout 1Vitodens 200-W, WB2B with a direct-connected heating circuitLegendAV Air vent (mod

Page 23

Table of Contents3PageGeneral InformationImportant Regulatory and Installation Requirements 5. . . . . . . . . . . . . . . . . . . . . . . . . . .Abou

Page 24

Boiler Connections30Installation Examples (continued)System layout 2Vitodens 200-W, WB2B with a direct-connected heating circuit and low-loss headerLe

Page 25

Boiler Connections31Installation Examples (continued)System layout 3Vitodens 200-W, WB2B with...– DHW storage tank– one heating circuit with mixing va

Page 26

Boiler Connections32Installation Examples (continued)System layout 4Vitodens 200-W, WB2B with...– DHW storage tank– one direct-connected heating circu

Page 27 - Installation Examples

Boiler Connections33Installation Examples (continued)System layout 5Vitodens 200-W, WB2B with...– DHW storage tank– one heating circuit with mixing va

Page 28

Boiler Connections34Installation Examples (continued)System layout 6Vitodens 200-W, WB2B with...– DHW storage tank– two heating circuits with a mixing

Page 29

Boiler Connections35Installation Examples (continued)System layout 7Vitodens 200-W, WB2B with...– direct-connected heating circuit– one heating circui

Page 30

Boiler Connections36Installation Examples (continued)System layout 8Vitodens 200-W, WB2B with...– DHW storage tank– low-loss header– multiple heating

Page 31

Boiler Connections37Installation Examples (continued)Vitodens 200-W, WB2B (alternate DHW connection)The following piping diagram reflects an alternati

Page 32

Boiler Connections38Installation Examples (continued)Boiler in heating/cooling applicationLegendHeating/Cooling unitSpring-loaded flow check valveCirc

Page 33

Boiler ConnectionsBoiler Connections39Installation Examples (continued)Boiler with low water cut-off (remote-mounted, field supplied)A low water cut-o

Page 34

Table of Contents4Control ConnectionsElectrical Connections 40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Page 35

Control Connections40Electrical ConnectionsOverview of electrical connections and plug-in connectorsPower supply connection of accessoriesThe power su

Page 36

Control Connections41Electrical Connections (continued)Connecting the Power/Pump module (continued)1. Remove the cover of the powerpump module. Using

Page 37

Control Connections42Electrical Connections (continued)Power/Pump module electrical connectorsLegend40- Power supply20A- System pumpsA - DHW pumpsÖ -

Page 38

Control Connections43Electrical Connections (continued)Boiler control board GC 130 electrical connectionsLegend40- Power supplysÖ - Boiler pumpA8 - LO

Page 39 - Venting Connection

Control Connections44Electrical Connections (continued)Connection between the Power/Pump module and boiler1. Remove and discard the greenfactory test

Page 40 - Electrical Connections

Control Connections45Electrical Connections (continued)Accessories electrical connectionsSee the following pages for connection to the individual acce

Page 41

Control Connections46Electrical Connections (continued)Accessing the X3 plug1. Remove the control unit cover (seepage 23).2. Remove the X3 plug from t

Page 42

Control Connections47Electrical Connections (continued)Connecting the outdoor temperature sensor1. Remove cover of outdoortemperature sensor.2. Mount

Page 43

Control Connections145144EXTERNALDEMAND31 214531 214431 214312 3123123143Power/Pump moduleFig. 4348Electrical Connections (continued)External switchin

Page 44

Control Connections49Electrical Connections (continued)Connecting the LON communication moduleInstalling the LON module to theVitotronic 200-H, HK1M m

Page 45

General Information5Important Regulatory and Installation RequirementsCodesThe installation of this unit shall be inaccordance with local codes or, in

Page 46

Control Connections50Electrical Connections (continued)Connecting the LON communication module (continued)See the Vitotronic 200-H,HK1M Installation I

Page 47

Control Connections51Electrical Connections (continued)Accessory kit connections for heating circuit with mixing valve part no. 7133392 (old version)S

Page 48

Control Connections52Electrical Connections (continued)Accessory kit connections for heating circuit with mixing valve part no. 7837524 (new version)T

Page 49

Control Connections53Electrical Connections (continued)Wiring diagram for the boiler / Power/Pump module5369 297 v1.6REPMUJLATOT.xam8ACAV021:STUPTUOsu

Page 50

Control Connections54Installing the Programming Unit of the ControlClosing the control unit and inserting the programming unit1.Install the cover onto

Page 51

Additional Information55Technical DataTable 4Boiler Model Model No. WB2B 19 26 35Natural gas / Liquid propane gasCSA inputCSA output/DOE*1heating capa

Page 52

Additional Information56Technical Data (continued)Table 4 (continued)Boiler Model Model No. WB2B 19 26 35DimensionsOverall depthOverall widthOverall h

Page 53

Additional Information57Wiring DiagramComplete system wiring diagramSee legend for this wiring diagram on next page.5369 297 v1.6NGLLGN LGNLGNLGNNGLTL

Page 54

Additional Information58Wiring Diagram (continued)Complete system wiring diagram (continued)5369 297 v1.6A1 Main PCB (GC130 Ignition Module)A2 Interna

Page 55 - Technical Data

Additional Information59Lighting and Operating Instructions5369 297 v1.6FOR YOUR SAFETY READ BEFORE OPERATINGW A R N I N G: If you do not follow these

Page 56 - Technical Data (continued)

General Information6Important Regulatory and Installation Requirements (continued)For installations on the Commonwealth of Massachusetts, the followin

Page 57 - Wiring Diagram

Additional Information60Ladder DiagramLegend-X1 [40] power supply 120 VAC-X1 [20A] pump, HTG system w/omixing valve, 120 VAC-X1 [21] pump DHW tank 120

Page 61 - 5369 297 v1.6

Viessmann Manufacturing Company Inc.750 McMurray RoadWaterloo, Ontario • N2V 2G5 • CanadaTel. (519) 885-6300 • Fax (519) 885-0887www.viessmann.ca • in

Page 62

General Information7About these Installation InstructionsTake note of all symbols and notations intended to draw attention to potential hazards or imp

Page 63

General InformationGeneral Information8ApplicabilityWhen ordering replacement parts,provide either the 16-digit boiler serialnumber (on the bar code l

Page 64

General Information9Mechanical RoomDuring the early stages of designing a new home, we recommend that proper consideration be given to constructing as