105547 909 - 05Rigid Venting Systems Installation About These Installation InstructionsTake note of all symbols and notations intended to draw attenti
115547 909 - 05Rigid Venting Systems InstallationGeneral Information General Installation InformationWARNINGEnsure that the entire venting system is p
125547 909 - 05Rigid Venting Systems Installation General Installation Information (continued)Recommended venting practiceWhen installing a venting sy
135547 909 - 05Rigid Venting Systems InstallationGeneral Information General Installation Information (continued)Fig. 3 Boiler models Vitodens 200-W
145547 909 - 05Rigid Venting Systems Installation Side Wall Venting Layouts (Coaxial)Layout with basic coaxial vent componentryFig. 4 Standard side wa
155547 909 - 05Rigid Venting Systems InstallationSide Wall Vent Installation (Coaxial) Side Wall Venting Layouts (Coaxial) (continued)Fig. 5 Side wal
165547 909 - 05Rigid Venting Systems Installation Side Wall Venting Layouts (Coaxial) (continued)Fig. 6 Side wall venting layout For Vitodens WB2B b
175547 909 - 05Rigid Venting Systems InstallationSide Wall Vent Installation (Coaxial) Component Installation GuideFig. 7 Coaxial vent termination Le
185547 909 - 05Rigid Venting Systems Installation Component Installation Guide (continued)Protective screenDimensionsabc12 in. (305 mm) must be at lea
195547 909 - 05Rigid Venting Systems InstallationSide Wall Vent Installation (Coaxial) 8...underneath a veranda, porch or deck, unless: the veranda,
25547 909 - 05Rigid Venting Systems Installation Safety, Installation and Warranty RequirementsIntroductionPlease ensure that these instructions are r
205547 909 - 05Rigid Venting Systems Installation Installation of Anchoring SystemFig. 11 The venting system must be securely supported by an anchori
215547 909 - 05Rigid Venting Systems InstallationSide Wall Vent Installation (Coaxial) Vent Length RequirementsMaximum vent lengthTable 5. Standard si
225547 909 - 05Rigid Venting Systems Installation Vent Length Requirements (continued)Side Wall Vent Installation (Coaxial) For maximum equivalent ve
235547 909 - 05Rigid Venting Systems Installation Vent Length Requirements (continued)Fig. 14 Vitodens 100-W, WB1B, Vitodens 200-W, WB2B, Vitodens 22
245547 909 - 05Rigid Venting Systems Installation Vertical Venting Layouts (Coaxial)Layout of Vertical Vent systems with accessoriesSelect from the ve
255547 909 - 05Rigid Venting Systems Installation Vertical Venting Layouts (Coaxial) (continued)General installation examples Ensure that the venting
265547 909 - 05Rigid Venting Systems Installation Component Installation GuideCoaxial vent termination installationVertical vent termination installat
275547 909 - 05Rigid Venting Systems InstallationVertical Vent Installation (Coaxial) Component Installation Guide (continued)Flashing and storm colla
285547 909 - 05Rigid Venting Systems Installation Installation of Support SystemThe venting system must be securely supported by a support system suit
295547 909 - 05Rigid Venting Systems InstallationVertical Vent Installation (Coaxial) Vent Length RequirementsBoiler model a (max. length)B2TA 19, 35B
35547 909 - 05Rigid Venting Systems InstallationTable of Contents PageSafety, Installation and Warranty Requirements...2 How these Insta
305547 909 - 05Rigid Venting Systems InstallationVertical Vent Installation (Coaxial) Vent Length Requirements (continued)Maximum vent length with inc
315547 909 - 05Rigid Venting Systems Installation Vent Length Requirements (continued)Equivalent vent length calculation exampleTable 13 Type of fitti
325547 909 - 05Rigid Venting Systems InstallationVertical Vent Installation (Coaxial) Component Parts of the Venting SystemHorizontal vent termination
335547 909 - 05Rigid Venting Systems Installation Component Parts of the Venting System (continued)Vent system dimensionsBoiler model a in. (mm)bin. (
345547 909 - 05Rigid Venting Systems Installation Direct Venting Options (Two-pipe System) Fig. 30 Single or two-pipe installationLegendA Combustion a
355547 909 - 05Rigid Venting Systems Installation Exhaust Vent/Air Intake RequirementsCombustion Air Supply The Vitodens boiler is suitable for sidewa
365547 909 - 05Rigid Venting Systems InstallationGeneral requirementsThe Vitodens 100-W, 222-F and 200-W boilers must be located in such a way that th
375547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) General Installation InformationInstallation steps (outline)Exhaust
385547 909 - 05Rigid Venting Systems Installation General Installation Information (continued)Table 16. Approved materials for two-pipe systemPart Mat
395547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) General Installation Information (continued)8...underneath a verand
45547 909 - 05Rigid Venting Systems InstallationTable of ContentsVertical Vent Installation (Coaxial) (continued)Direct Venting (Two-pipe System)Vent
405547 909 - 05Rigid Venting Systems Installation Vent Requirements - Stainless SteelIMPORTANTFor exhaust vent pipe material:Do not use any other vent
415547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Vent Requirements - Stainless Steel (continued)Additional requiremen
425547 909 - 05Rigid Venting Systems Installation Vent Requirements - Stainless Steel (continued)Additional requirements for stainless steel vent pipe
435547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Vent Requirements - Stainless Steel (continued)Additional requiremen
445547 909 - 05Rigid Venting Systems Installation Component Parts of the Venting System - Stainless SteelFig. 36 Termination Coupling with ScreenFig.
455547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Vent Requirements - CPVCAdditional requirements for UL/ULC listed CP
465547 909 - 05Rigid Venting Systems Installation Requirements for UL/ULC Listed Rigid PP(s) Vent Pipe MaterialThe venting system must be installed by
475547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Vent and Air Intake Pipe Starter Adaptors - CPVCWARNING(For this typ
485547 909 - 05Rigid Venting Systems Installation Vent and Air Intake Pipe Starter Adaptors - CPVC (continued)LegendA Air intake, max. insertion 2½ in
495547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Vent and Air Intake Pipe Starter Adaptors - PP(s)WARNING(For this ty
55547 909 - 05Rigid Venting Systems InstallationTable of ContentsDirect Venting (Two-pipe System) (continued)Single Pipe Venting(Room Air Dependent)Re
505547 909 - 05Rigid Venting Systems Installation Vent Pipe Starter Adaptors - PP(s) (continued)Fig. 45Legend a 3 in. (76 mm) b 2¾ in. (70 mm) c
515547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Side Wall Vent Termination - Stainless Steel, CPVC or PP(s)IMPORTANT
525547 909 - 05Rigid Venting Systems Installation Vent Length RequirementsMaximum vent/air intake pipe length - horizontalIMPORTANTAlways include vent
535547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Vent Length Requirements (continued)Fig. 51 Vitodens 200-W WB2B 45,
545547 909 - 05Rigid Venting Systems Installation Vent Length Requirements (continued)Maximum vent/air intake pipe length - vertical (continued)Note:
555547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Vent Length Requirements (continued)Multiple boiler installations (v
565547 909 - 05Rigid Venting Systems InstallationAir Flue Vent Length Requirements (continued)Maximum vent/air intake pipe length - horizontal/vertica
575547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Vent Length Requirements (continued)Maximum vent/air intake pipe len
585547 909 - 05Rigid Venting Systems Installation Vent Length Requirements (continued)Equivalent vent length calculation example - stainless steel sys
595547 909 - 05Rigid Venting Systems InstallationDirect Venting (Two-pipe System) Vent Length Requirements (continued)Equivalent vent length calculati
65547 909 - 05Rigid Venting Systems InstallationTable of Contents PageComponent parts of the venting system - stainless steel...
605547 909 - 05Rigid Venting Systems Installation Vent Length Requirements (continued)Direct Venting (Two-pipe System)LegendA Support systemB Exhaust
615547 909 - 05Rigid Venting Systems InstallationB2HA 19, 28, 35B2HB 19, 26, 35B2TA 19, 35B2TB 19, 35 Component Parts of the PP(s) Venting SystemDirec
625547 909 - 05Rigid Venting Systems InstallationB2HA 19, 28, 35B2HB 19, 26, 35B2TA 19, 35B2TB 19, 35 Component Parts of the PP(s) Venting System (con
635547 909 - 05Rigid Venting Systems Installation Venting - Single Pipe (Room Air Dependent)This system draws combustion air from the boiler room. Roo
645547 909 - 05Rigid Venting Systems Installation Vent Requirements Combustion air supplyThis boiler requires fresh air for safe operation and must be
655547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) Vent Requirements (continued)Combustion air supply (continue
665547 909 - 05Rigid Venting Systems InstallationInstallation steps (outline)Exhaust vent pipe materialUse only the materials listed in table 30 for e
675547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) General Installation Information (continued)Approved materia
685547 909 - 05Rigid Venting Systems Installation General Installation Information (continued)Single Pipe Venting (Room Air Dependent)8...underneath a
695547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) General Installation Information (continued)Support systemTh
75547 909 - 05Rigid Venting Systems Installation Important Regulatory and Installation RequirementsFor installations on the Commonwealth of Massachuse
705547 909 - 05Rigid Venting Systems Installation General Installation Information (continued)Additional requirements for stainless steel vent pipe ma
715547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) General Installation Information (continued)Additional requi
725547 909 - 05Rigid Venting Systems Installation General Installation Information (continued)Additional requirements for stainless steel vent pipe ma
735547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) General Installation Information (continued)Additional requi
745547 909 - 05Rigid Venting Systems Installation General Installation Information (continued)Additional requirements for CPVC vent pipe materialUse U
755547 909 - 05Rigid Venting Systems InstallationTable 34 Required starter adaptors and mesh screen for CPVC systemPart Boiler Model Size Supplier Qua
765547 909 - 05Rigid Venting Systems Installation Requirements for UL/ULC Listed Rigid PP(s) Vent Pipe MaterialWhen replacing parts, use original manu
775547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent)Vent pipe starter adaptors for WB1B 26, 35, B2TA 19, 35, B2TB
785547 909 - 05Rigid Venting Systems Installation Side Wall Vent TerminationFor PP(s) systems, all exhaust vent and air intake piping and elbows expos
795547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) Vent Length RequirementsMaximum vent pipe length - horizonta
85547 909 - 05Rigid Venting Systems Installation Important Regulatory and Installation Requirements (continued)The venting system must be installed by
805547 909 - 05Rigid Venting Systems Installation Vent Length Requirements (continued)Maximum vent pipe length - verticalAll PP(s) vent material and a
815547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) Vent Length Requirements (continued)Standard long sweep elbo
825547 909 - 05Rigid Venting Systems Installation Component Installation GuideGeneral single-pipe vertical venting layoutLegend1 Coaxial vent pipe ada
835547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) Component Installation Guide (continued)Single-pipe vent sta
845547 909 - 05Rigid Venting Systems Installation Component Installation Guide (continued)See table below for the following two conditions. For slope
855547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) Component Installation Guide (continued)Fig. 89Fig. 90Multi
865547 909 - 05Rigid Venting Systems Installation Component Installation Guide (continued)Single-pipe vent termination installationInstall the vent te
875547 909 - 05Rigid Venting Systems InstallationSingle Pipe Venting (Room Air Dependent) Component Installation Guide (continued)Equivalent vent leng
885547 909 - 05Rigid Venting Systems Installation Installation of Support System - (PPs)The venting system must be securely supported by a support sys
895547 909 - 05Rigid Venting Systems Installation Two Pipe Options WB1B 26/35, WB2B 19/26/35, B2TA/B2TB 19/35, B2HA 19/28/35, B2HB 19/26/35 (Direct V
95547 909 - 05Rigid Venting Systems InstallationSafety Important Regulatory and Installation Requirements (continued) Table 1. Clearance to combustibl
905547 909 - 05Rigid Venting Systems Installation Single Pipe Options WB1B 26/35, WB2B 19/26/35, B2TA/B2TB 19/35, B2HA 19/28/35, B2HB 19/26/35 (Room A
915547 909 - 05Rigid Venting Systems InstallationComponentry (System Options) Two Pipe Options WB2B 45/60, B2HA 45/60 (Direct Vent) IMPORTANTFor PP(s)
925547 909 - 05Rigid Venting Systems Installation Single Pipe Options WB2B 45/60, B2HA 45/60 (Room Air Dependent) For PP(s) systems, all exhaust vent
935547 909 - 05Rigid Venting Systems InstallationComponentry (System Options) Two Pipe Options WB2B 80/105, B2HA 80, 100, 112, 150 (Direct Vent) IMPOR
945547 909 - 05Rigid Venting Systems Installation Single Pipe Options WB2B 80/105, B2HA 80, 100, 112, 150 (Room Air Dependent) For PP(s) systems, all
955547 909 - 05Rigid Venting Systems InstallationComponentry (System Options) Coaxial Vent System Options (Direct Vent) WB1B 26/35, B2TA 19/35 WB2B 19
5547 909 - 05Rigid Venting Systems Installation Technical information subject to change without notice.Printed on environment