Viessmann Vitogas 100 GS1 Series Manuel de service

Naviguer en ligne ou télécharger Manuel de service pour Chauffe-eau et chaudières Viessmann Vitogas 100 GS1 Series. Viessmann Vitogas 100 GS1 Series Technical data Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 36
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Read and save these instructions
for future reference.
IMPORTANT
VITOGAS 100
Installation Instructions
for Use by Heating Contractor
Vitogas 100
GS1 Series
Natural gas-/propane-fired, single-stage
atmospheric cast-iron boiler
Heating input 90 to 240 MBH
26 to 70 kW
Please file in Service Binder
5167 463 v1.3 02/2011
Vue de la page 0
1 2 3 4 5 6 ... 35 36

Résumé du contenu

Page 1 - Installation Instructions

Read and save these instructionsfor future reference.IMPORTANTVITOGAS 100Installation Instructionsfor Use by Heating ContractorVitogas 100GS1 SeriesNa

Page 2

Set-up10Boiler Set-up and OrientationFor Vitogas 100, GS1installations on a Vitocell tank,reference the InstallationInstruction Supplementsupplied wit

Page 3 - Contents

Boiler Control / Connections11Boiler Control Base Installation1. Loosen screws and remove toppanel.2. Unlock front panel and remove.3. Carefully push

Page 4

ConnectionsConnections12Electrical Connections (continued)Boiler wiringFor detailed informationregarding connections on controlbase, see InstallationI

Page 5

Connections13Venting ConnectionSafety inspection of existingventing systemWhen existing boiler is removed from acommon venting system, the commonventi

Page 6 - Product Information

Connections14Venting Connection (continued)ChimneyA corrosion-resistant approved linermust be installed in masonry or unlinedchimneys. The liner shoul

Page 7 - Mechanical Room

Connections15Venting Connection (continued)Combustion test opening ∅½”Do not run vent connector along outsidewall.The diameter of the vent pipe must b

Page 8 - Minimum Clearances

Connections16Venting Connection (continued)Vent damper installationIf boiler is sold with a vent damper(packaged separately), the vent dampermust be i

Page 9

Connections17Gas Connection and Piping1. Size and connect gas supply piping inaccordance with local and nationalcodes.2. Before connecting boiler to g

Page 10 - Boiler Set-up and Orientation

Connections18Water Side ConnectionsInstallation InstructionsDivicon StationThis boiler is designed for closed loop,forced circulation heating systems

Page 11 - Electrical Connections

Connections19Safety Connections and Pressure TestingInstallation InstructionsViessmann Safety Header(accessory)Installing safety devices on the boiler

Page 12 - IMPORTANT

Safety, Installation and Warranty Requirements2Safety, Installation and Warranty RequirementsPlease ensure that these instructions are read and unders

Page 13 - Venting Connection

Connections20Safety Connections and Pressure Testing (continued)Performing pressure test on the boilerThe boiler must be leak tested beforebeing place

Page 14 - Connections

Connections21Installation ExamplesGeneralThe schematics on the following pagesare to be seen as guidelines only. Theyfurther do not display all system

Page 15

Connections22Installation Examples (continued)Installation ExamplesThese examples show possible piping layoutsfor Viessmann product equipped withViess

Page 16

Connections23Installation Examples (continued)With 3-way mixing valve to regulate heating circuite.g. with Vitotronic 200, KW2 combined with a mixing

Page 17 - Gas Connection and Piping

Connections24Installation Examples (continued)With 4-way mixing valve to regulate heating circuite.g. with Vitotronic 200, KW2 combined with a mixing

Page 18 - Water Side Connections

Connections25Installation Examples (continued)System with multiple zonesIf system has motorized zone valves andsingle circulating pump installed, oper

Page 19

Connections26Installation Examples (continued)Boiler in a heating/cooling applicationThe boiler, when used in connectionwith a refrigeration system, m

Page 20 - DHW Side Connections

Connections27Installation Examples (continued)Boiler with low water cut-offA low water cut-off may be required bylocal codes. If boiler is installed a

Page 21 - Installation Examples

Connections/Fresh Air28Installation Examples (continued)Important precautionsAvoid frequent system waterreplenishmentThis boiler is not for use in sys

Page 22

Connections/Fresh Air29Installation Examples (continued)Important precautions (continued)Legend:Heating circuitSpring-loaded flow check valveCircuit p

Page 23

Contents3PageSafetyImportant Regulatory and Installation Requirements 4. . . .General InformationAbout these Installation Instructions 6. . . . . . .

Page 24

Fresh Air30Combustion Air Supply (continued)Louvres and grillesIn calculating free area as specified onpage 29 and 30, consideration shall begiven to

Page 25

Appendix31Post-Installation ...Start-up informationStart-up/Service Instructionsof boiler and controlService Binder1. File all Parts Lists, Operating

Page 26

Wiring Diagrams#14.0”Vitogas 100, GS1 with Vitotronic 100, KK10 / KW10A/KW10B Vitogas 100, GS1 with Vitotronic 100, KW10 / KW10A/KW10B**Not used with

Page 27

Wiring Diagrams4.0”Vitogas 100, GS1 with Vitotronic 200Vitogas 100, GS1 with Vitotronic 30033Vitogas 100, GS1 with Vitotronic 200 and 300 ControlsPlea

Page 28 - Connections/Fresh Air

Wiring Diagrams400 ºF / 204 ºC235 ºF / 113 ºCLegend41 Terminals in plugR Relay coil 11R Contact of relay 1LC Limit contact in boiler controlT 120 V /

Page 30 - Fresh Air

Viessmann Manufacturing Company Inc.750 McMurray RoadWaterloo, Ontario • N2V 2G5 • CanadaTel. (519) 885-6300 • Fax (519) 885-0887www.viessmann.ca • in

Page 31 - Technical Data

Safety4Important Regulatory and Installation RequirementsCodesThe installation of this unit shall be inaccordance with local codes or, in theabsence o

Page 32 - Wiring Diagrams

Safety5Safety, Installation and Warranty Requirements (continued)Fiberglass wool and ceramic fibermaterialsThe state of California has listed theairbo

Page 33

General Information6About these Installation InstructionsTake note of all symbols and notations intended to draw attention to potential hazards or imp

Page 34

General Information7Mechanical RoomDuring the early stages of new home design, we recommend that properconsideration be given to constructing a separa

Page 35 - 5167 463 v1.3

Set-upSet-up8Before Set-upBefore placing boiler in its installationlocation, ensure all necessaryaccessories (e.g. boiler stand) areinstalled. Do not

Page 36

Set-up9Minimum ClearancesRecommended minimum clearances to combustiblesFor typical installations, Viessmann recommends installing the boiler withclear

Commentaires sur ces manuels

Pas de commentaire