Viessmann VITOPLEX 200 Type SX2A Instructions d'exploitation

Naviguer en ligne ou télécharger Instructions d'exploitation pour Chauffe-eau et chaudières Viessmann VITOPLEX 200 Type SX2A. Viessmann VITOPLEX 200 Type SX2A Operating instructions Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 40
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Service instructions
for contractors
VIESMANN
Vitoplex 200
Type SX2A, 700 to 1950 kW
Oil/gas boiler
For applicability, see the last page
VITOPLEX 200
5692 849 GB 10/2013
Please keep safe.
Vue de la page 0
1 2 3 4 5 6 ... 39 40

Résumé du contenu

Page 1 - VIESMANN

Service instructionsfor contractorsVIESMANNVitoplex 200Type SX2A, 700 to 1950 kWOil/gas boilerFor applicability, see the last pageVITOPLEX 2005692 849

Page 2

1012. The dew point range must becleared as quickly as possible. Forthis reason prevent all heat supplyto consumers when heating the sys-tem from col

Page 3 - Safety instructions (cont.)

11Opening the boiler door and cleaning coverNoteOn gas burners, disconnect the gas sup-ply pipe.4xCommissioning, inspection, maintenanceFurther detail

Page 4

12Cleaning the turbulators, heating surface, flue outlet and fluepipe1. Pull turbulators B out towards thefront with a quick tug. For this, useturbula

Page 5

13Inserting turbulators, securing the boiler door and cleaningcoverNoteOn gas burners, mount the gas supplypipe.DangerEscaping gas leads to a risk ofe

Page 6

141. Push turbulators C far into hot gasflues B. Spring clip E must snapinto place behind first constrictionD.NoteThis snapping into place prevents th

Page 7

15Pump controlled pressure maintaining systemsIn heating systems with automatic pres-sure maintaining systems provide indi-vidual protection by instal

Page 8

16Enter the amount of top-up water and thetotal hardness of the feed and boilerwater into the table.Meter read-ingFill and top-up waterTotal watervolu

Page 9 - Commissioning the system

17Cleaning the sight glass in the boiler doorNoteCheck the gaskets and hose connectionfor leaks.Checking the mixer for ease of operation and leaks1.

Page 10 - Shutting down the system

18RatedheatingoutputPressure drop on thehot gas sidekW Pa mbar1600 650 6.51950 850 8.5To protect the system against dew pointcorrosion, burner stage 2

Page 11 - 5692 849 GB

19Operating and service documents1. Complete and detach the customerregistration card: Hand the system user their sectionfor safekeeping. Retain th

Page 12

2Please follow these safety instructions closely to prevent accidents and mate-rial losses.Safety instructions explainedDangerThis symbol warns agains

Page 13

20Information on ordering spare partsQuote the part and serial numbers (seetype plate) and the position number ofthe required part (as per this parts

Page 14

21305 Decorative adhesive tape306 Flame tube gasket packAType plate, optionally left or rightBBoiler control unit (see parts list inthe service instru

Page 15 - Checking the water quality

22For boiler sizes 700 to 1300 kW011 010012008009001024025004005006007003308Parts listsParts list (cont.)5692 849 GB

Page 16

23For boiler sizes 1600 to 1950 kW012011008009024 025004005006007003001 010A308Parts listsParts list (cont.)5692 849 GB

Page 17

24C014C016017224018015014013002020023021022QuantitykW 700 900 1100Rated outputNote on position number 0136452525242421300 1600 1950Parts listsParts li

Page 18 - Instructing the system user

25201204 225213214213227226200200202203212210208206206201206206Parts listsParts list (cont.)5692 849 GB

Page 19

26206221219223218203205217216215206211209207206208B222220A228307Parts listsParts list (cont.)5692 849 GB

Page 20 - Parts list

27NoteObserving the following requirements is necessary to safeguard your warrantyrights.The warranty excludes damage due to corrosion and scaling.Hea

Page 21 - Parts list (cont.)

28When engineering the system, observethe following: Install shut-off valves in the differentsections. This prevents the need fordraining all the hea

Page 22

29The characteristic blackening of thewater after some time in use indicatesthat free oxygen is no longer present.The technical rules and in particula

Page 23

3If you smell flue gasDangerFlue gas can lead to life threat-ening poisoning. Shut down the heating system. Ventilate the installation site. Close

Page 24

30Viessmann boilers are designed andbuilt for water as a heat transfer medium.To protect boiler systems from frost, itmay be necessary to treat the bo

Page 25

31 After filling, ensure there are no moreair cushions in the system. When thetemperature falls, gas cushions formnegative pressure and this can draw

Page 26

32 Commissioning Service Service date: by: Service Service Service date: by:

Page 27 - Water quality requirements

33Rated heating output kW 700 900 1100 1300 1600 1950Flue gas parameters*4 Temperature at boiler watertemperature 60 °C – at r

Page 28

34We, Viessmann Werke GmbH&Co KG, D-35107 Allendorf, declare as sole respon-sible body, that the following product complies with the standards spe

Page 29

35We, Viessmann Werke GmbH&Co KG, D-35107 Allendorf, confirm that the productVitoplex 200, type SX2A, 700 to 1950 kW complies with the following c

Page 30 - Using antifreeze in boilers

36AAdjusting the burner...17Anti-corrosion measures...29BBoiler door– Opening...

Page 31

375692 849 GB

Page 32

385692 849 GB

Page 34 - Declaration of conformity

4Repair work!Please noteRepairing components that fulfil asafety function can compromisethe safe operation of the sys-tem.Faulty components must berep

Page 35

40ApplicabilitySerial No.:7438485 7438486 7438487 74384887438489 7438490Viessmann LimitedHortonwood 30, TelfordShropshire, TF1 7YP, GBTelephone: +44 1

Page 36

5Product informationIntended use... 6Commissioni

Page 37

6The appliance is only intended to beinstalled and operated in sealed unven-ted heating systems that comply withEN 12828, with due attention paid to t

Page 38

7For further information regarding the individual steps, see the page indicatedCommissioning stepsInspection stepsMaintenance steps Page• • •1. Commis

Page 39

8Commissioning stepsInspection stepsMaintenance steps Page•21. Operating and service documents... 19Commissioning, inspec

Page 40 - Applicability

9Commissioning the systemOperating and service instruc-tions for the control unit and theburner01. Close the gas shut-off valve andopen the boiler do

Commentaires sur ces manuels

Pas de commentaire