Viessmann WB2B Guide d'installation

Naviguer en ligne ou télécharger Guide d'installation pour Chauffe-eau et chaudières Viessmann WB2B. Viessmann WB2B Installation guide Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 88
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Venting System
Installation Instructions
for use by heating contractor
Venting System
for Vitodens 100-W WB1B Series
and Vitodens 200-W WB2B Series
Vitodens 100-W, WB1B and
Vitodens 200-W WB2B Series
(with preinstalled coaxial vent pipe adaptor)
Read and save these instructions
for future reference.
IMPORTANT
Please file in Service Binder
5368 815 v2.0 b 08/2009
This trademark is registered with the U.S. Patent and Trademark Office.
Vue de la page 0
1 2 3 4 5 6 ... 87 88

Résumé du contenu

Page 1 - Installation Instructions

Venting SystemInstallation Instructionsfor use by heating contractorVenting Systemfor Vitodens 100-W WB1B Seriesand Vitodens 200-W WB2B SeriesVitoden

Page 2

General InformationGeneral Information10General Installation InformationInstallation steps (outline)Boiler operation in marine environments(damp, salt

Page 3

General Information11General Installation Information (continued)Recommended venting practiceWhen installing a venting system thefollowing recommended

Page 4 - (Two-pipe System)

General InformationABFig. 312General Installation Information (continued)Boiler vent connectionsBoiler models Vitodens 100-W WB1B 10-26/30 and Vitoden

Page 5 - (Room Air Dependent)

Side Wall Vent Installation (Coaxial)Fig. 4 Standard side wall venting layout, using basic vent kit componentsfor vent systems 60/100, 80/125 and 100/

Page 6

Side Wall Vent Installation (Coaxial)Fig. 5Transition adaptor used only for 80 and 105 modelsSide wall venting layout, using basic vent kit components

Page 7

Side Wall Vent Installation (Coaxial)15Side Wall Venting Layouts (Coaxial) (continued)Layout with basic coaxial vent kit and accessory componentryStra

Page 8

Side Wall Vent Installation (Coaxial)16Component Installation GuideOffset installation(e.g. for offset venting systems)(2 × 45º elbow)Minimum offset o

Page 9

Side Wall Vent Installation (Coaxial)17Component Installation Guide (continued)Coaxial vent telescopic extension installation (sliding coupling)Fig. 7

Page 10 - IMPORTANT

Side Wall Vent Installation (Coaxial)18Component Installation Guide (continued)Coaxial vent termination installationVent terminationWall flashing (ins

Page 11 - General Information

Side Wall Vent Installation (Coaxial)19Component Installation Guide (continued)Coaxial vent termination installation (continued)6. Secure protective s

Page 12

Safety, Installation and Warranty Requirements2Safety, Installation and Warranty RequirementsPlease ensure that these instructions are read and unders

Page 13

Side Wall Vent Installation (Coaxial)20Component Installation Guide (continued)Vent termination location requirements (for installations in Canada)The

Page 14

Side Wall Vent Installation (Coaxial)Fig. 12Fig. 1321Component Installation Guide (continued)Vent termination location requirements (for installations

Page 15

Side Wall Vent Installation (Coaxial)Fig. 14 Equivalent vent length calculation*422Vent Length RequirementsMaximumventlengthTable 8. Table 9.Standard

Page 16 - Component Installation Guide

Side Wall Vent Installation (Coaxial)23Vent Length Requirements (continued)Maximum vent length w ith increasersMinimum vent lengthThe minimum equivale

Page 17

Vertical Vent Installation (Coaxial)24Vertical Venting Layouts (Coaxial)Layout of vertical vent system with accessoriesPlease note that there is no ba

Page 18

Vertical Vent Installation (Coaxial)25Vertical Venting Layouts (Coaxial) (continued)General installation examplesEnsure that the venting system isprop

Page 19

Vertical Vent Installation (Coaxial)26Component Installation GuideOffset installation(e.g. for offset venting systems)(2 × 45º elbow)Minimum offset of

Page 20

Vertical Vent Installation (Coaxial)27Component Installation Guide (continued)Coaxial vent telescopic extension installationFig. 20 Coaxial venttelesc

Page 21

Vertical Vent Installation (Coaxial)28Component Installation Guide (continued)Coaxial vent termination installationFig. 21 Coaxial vent terminationØbØ

Page 22 - Vent Length Requirements

Vertical Vent Installation (Coaxial)29Component Installation Guide (continued)Flashing and storm collar installationFlashings and storm collars are fi

Page 23

Index3PageSafetyImportant Regulatory and Installation Requirements 6...General InformationAbout these Installation Instruction

Page 24

Vertical Vent Installation (Coaxial)Fig. 25Fig. 2630Installation of Support SystemThe venting system must be securelysupported by a support system sui

Page 25

Vertical Vent Installation (Coaxial)31Vent Length RequirementsMaximumventlengthTable 16.Boiler model WB1B10-2610-35WB2B9-199-26WB2B9-35WB2B17-45WB2B17

Page 26

Vertical Vent Installation (Coaxial)32Vent Length Requirements (continued)Maximum vent length w ith increasersTable 17. Maximum vent length for vertic

Page 27

Vertical Vent Installation (Coaxial)33Vent Length Requirements (continued)Equivalent vent calculation examplesTable 19.Vent terminationVent pipe (3.3

Page 28

Componentry34Component Parts of the Venting SystemTable 21.Vent system size Dimensions [in./mm]a b c60/100 2.4/60 4/100 1.6/5080/125 3/80 5/125 1.6/50

Page 29 - See WARNING below

Componentry35Component Parts of the Venting System (continued)Table 24.Vent system size Dimensions [in./mm]a b c d e60/100 2.4/60 4/100 1.6/40 1.2/30

Page 30

Componentry36Component Parts of the Venting System (continued)Total length of vent termination pipeis 31”/787 mm. If required, the venttermination pip

Page 31

Componentry37Component Parts of the Venting System (continued)Vertical vent terminationFig. 30 Coaxial ventterminationØbØaAABBcdefgWall bandfor instal

Page 32

Componentry38Component Parts of the Venting System (continued)Basic vent kit components (Side Wall Vent System only)Basic componentsVent pipe adaptor(

Page 33

Componentry39Component Parts of the Venting System (continued)Vent accessoriesAccessory componentsStraight pipe,1.6 ft./0.5 m*1Elbow (45º)(2 per carto

Page 34 - Componentry

Index4PageDirect Venting(Two-pipe System)Direct Venting Options (Two-pipe System) 40...Exhaust Vent/Air Int

Page 35

Direct Venting (Two-pipe System)ABFig. 33 Coaxial vent pipe systemA Combustion airB Flue gas40Direct Venting Options (Two-pipe System)Boiler models Vi

Page 36

41Exhaust Vent/Air Intake RequirementsCombustion air supplyThe Vitodens boiler is suitable forsidewall, as well as vertical ventingusing field supplie

Page 37

Direct Venting (Two-pipe System)42Exhaust Vent/Air Intake Requirements (continued)General requirementsThe Vitodens 100-W and 200-Wboilers must be loca

Page 38

Direct Venting (Two-pipe System)43General Installation InformationInstallation steps (outline)Exhaust and combustion air pipingmaterialUse only the ma

Page 39

Direct Venting (Two-pipe System)44General Installation Information (continued)Installation steps (outline) (continued)Table 32. Approved materials for

Page 40

Direct Venting (Two-pipe System)45General Installation Information (continued)Vent termination location requirements (for installations in Canada)The

Page 41

Direct Venting (Two-pipe System)46General Installation Information (continued)Vent termination location requirements (for installations in the U.S.A.)

Page 42

Direct Venting (Two-pipe System)47Vent Requirements - Stainless SteelAdditional requirements for stainless steel vent pipe materialUse an AL29-4C® spe

Page 43

Direct Venting (Two-pipe System)48Vent Requirements - Stainless Steel (continued)Additional requirements for stainless steel vent pipe material (conti

Page 44

Direct Venting (Two-pipe System)49Vent Requirements - Stainless Steel (continued)Additional requirements for stainless steel vent pipe material (conti

Page 45

Index5PageSingle Wall Venting(Room Air Dependent)Venting - Single Wall (Room Air Dependent) 64...Vent Requirem

Page 46

Direct Venting (Two-pipe System)50Vent Requirements - Stainless Steel (continued)Additional requirements for stainless steel vent pipe material (conti

Page 47

Direct Venting (Two-pipe System)51Component Parts of the Venting SystemTerminationCoupling with ScreenTerminationElbow with Screen90° or 45°Terminatio

Page 48

Direct Venting (Two-pipe System)52Vent Requirements - CPVCAdditional requirements for UL/ULC-listed CPVC vent pipe materialUse UL/ULC-listed special p

Page 49 - (see fig. 37)

Direct Venting (Two-pipe System)53Vent Pipe Starter AdaptorsParallel vent pipe starter adaptorsfor WB1B 10-26, 10-35 /WB2B 9-19/26/355368 815 v2.0 bBA

Page 50 - (see fig. 41)

Direct Venting (Two-pipe System)54Vent Pipe Starter AdaptorsParallel vent pipe starter adaptorsfor WB2B 17-45, 17-60LegendAir intake, max. insertion 2

Page 51

Direct Venting (Two-pipe System)55Side Wall Vent Termination (stainless steel or CPVC)The exhaust vent/air intake systemmust terminate so that properc

Page 52 - Vent Requirements - CPVC

Direct Venting (Two-pipe System)56Vent Length RequirementsMaximum vent/air intake pipe length - horizontalThe total equivalent length specified fora t

Page 53 - Vent Pipe Starter Adaptors

Direct Venting (Two-pipe System)57Vent Length Requirements (continued)Maximum vent/air intake pipe length - horizontal (continued)LegendSupport system

Page 54

Direct Venting (Two-pipe System)58Vent Length Requirements (continued)Maximum vent/air intake pipe length - vertical (continued)Note:For combination o

Page 55

Direct Venting (Two-pipe System)59Vent Length Requirements (continued)Maximum vent/air intake pipe length - horizontal/vertical (hybrid system)The tot

Page 56

General InformationGeneral Information6About these Installation InstructionsTake note of all symbols and notations intended to draw attention to poten

Page 57 - See figure 49 and 50

Direct Venting (Two-pipe System)60Vent Length Requirements (continued)Maximum vent/air intake pipe length - horizontal/vertical (hybrid system) (conti

Page 58

Direct Venting (Two-pipe System)61Vent Length RequirementsMaximum equivalent vent length - stainless steel system with plastic air intake pipeTable 43

Page 59

Direct Venting (Two-pipe System)62Vent Length RequirementsMaximum equivalent vent length - CPVC systemTable 44. (see also fig. 55)Type of fittingEquiv

Page 60

Direct Venting (Two-pipe System)63Vent Length Requirements (continued)Maximum equivalent vent length - CPVC system (continued)LegendSupport systemExha

Page 61

Combustionair openingCCSingle Wall Venting (Room Air Dependent)64Venting - Single Wall (Room Air Dependent)WB2B 17-45/60, 30-80/105 ModelsThis system

Page 62

Single Wall Venting (Room Air Dependent)65Vent Requirements (continued)Combustion air supply (continued)Inspect all finished exhaust vent/airintake pi

Page 63

Single Wall Venting (Room Air Dependent)66General Installation Information (continued)Installation steps (outline)Exhaust vent pipe materialUse only t

Page 64 - Vent Requirements

Single Wall Venting (Room Air Dependent)67General Installation Information (continued)Approved materials for single-wall vent systemTable 45. Approved

Page 65 - Vent Requirements (continued)

Single Wall Venting (Room Air Dependent)68General Installation Information (continued)Vent termination location requirements (for installations in Can

Page 66

Single Wall Venting (Room Air Dependent)69General Installation Information (continued)Vent termination location requirements (for installations in the

Page 67

Safety7Important Regulatory and Installation RequirementsFor installations in the Commonwealth of Massachusetts, the following local requirements appl

Page 68

Single Wall Venting (Room Air Dependent)70General Installation Information (continued)Support systemThe venting system must be securelysupported by a

Page 69

Single Wall Venting (Room Air Dependent)Single Wall Venting (Room Air Dependent)71General Installation Information (continued)Additional requirements

Page 70

72General Installation Information (continued)Additional requirements for stainless steel vent pipe material (continued)Table 46. Exhaust vent termina

Page 71

Single Wall Venting (Room Air Dependent)73General Installation Information (continued)Additional requirements for stainless steel vent pipe material (

Page 72 - (see fig. 64)

Single Wall Venting (Room Air Dependent)74General Installation Information (continued)Additional requirements for stainless steel vent pipe material (

Page 73 - 10.34” / 263 mm

Single Wall Venting (Room Air Dependent)75General Installation Information (continued)Additional requirements for CPVC vent pipe materialUse UL/ULC-li

Page 74 - 6.5” / 165 mm

Single Wall Venting (Room Air Dependent)76Side Wall Vent Termination5368 815 v2.0 bGrade or Snow Level(see also Vent Riser fig. 70)Fig. 68Exhaust vent

Page 75

Single Wall Venting (Room Air Dependent)77Vent Length RequirementsMaximum vent pipe length - horizontalSize the exhaust vent pipe as specifiedin the t

Page 76 - Side Wall Vent Termination

Single Wall Venting (Room Air Dependent)78Vent Length Requirements (continued)Maximum vent pipe length - verticalSize the exhaust vent pipe as specifi

Page 77

Single Wall Venting (Room Air Dependent)79Vent Length RequirementsStandard long sweep elbows (for CPVC pipes only)Fig. 73For plastic pipe only90° long

Page 78

Safety8Important Regulatory and Installation Requirements (continued)When replacing parts, use originalViessmann or Viessmann approvedreplacement part

Page 79

Single Wall Venting (Room Air Dependent)80Component Installation GuideCoaxial vent pipe adaptor (comespre-installed on Vitodens 100-W,WB1B 10-26, 10-3

Page 80

Single Wall Venting (Room Air Dependent)81Component Installation Guide (continued)Single-wall vent pipe starter adaptor installation1. Apply small amo

Page 81

Single Wall Venting (Room Air Dependent)82Component Installation Guide (continued)Flashing and storm collar installationFlashings and storm collars ar

Page 82

Single Wall Venting (Room Air Dependent)83Component Installation Guide (continued)Single-wall vent termination installationInstall the vent terminatio

Page 83

Single Wall Venting (Room Air Dependent)84Component Installation Guide (continued)Equivalent vent length calculation example - verticalEquivalent vent

Page 85 - 5368 815 v2.0 b

865368 815 v2.0 b

Page 86

875368 815 v2.0 b

Page 87

Viessmann Manufacturing Company Inc.750 McMurray RoadWaterloo, Ontario • N2V 2G5 • Canada1-800-387-7373 • Fax (519) 885-0887www.viessmann.ca • info@vi

Page 88

Safety9Important Regulatory and Installation Requirements (continued)Table 1. Clearance to combustiblesTopFront Rear Left Right Vent pipe0”/mm 0”/mm 0

Commentaires sur ces manuels

Pas de commentaire